Grady Building
Project Details
This project is Focus Development's new headquarters in La Jolla and was completed working around the unique constraints of the downtown area. Exterior CMU walls are sandwiched between two buildings due to zero property lines. Scheduling was precise as we could only stage and hoist materials from within the buildings footprint. An interior steel structure was built inside the CMU wall. Exterior look and interior finishes are modern presenting an extremely high end look.
- Architect - Alcorn and Associates
- Client - Steven M Grady
Recent Entries
-
La Jolla Gateway FOODA9191 Towne Center Drive Suite #175 San Diego, CA 92122
-
Gateway at Torrey Hills Cafe3570 Carmel Mountain Road Floor 1 San Diego CA 92130
-
Marriott 5th Level Terrace Upgrades900 Bayfront Court San Diego, CA 92101